c

Final stage of demolition at The Monument Building site

Press release 08/10/2014 09:00 CET

The final stages of demolition and preparation of The Monument Building site are currently underway, before construction of the MAKE-designed building commences.

The building will provide 90,000 sqft of Grade A office accommodation over nine floors, with stunning roof terraces and iconic feature façade.

Centrally located opposite Monument tube station and within a short walk of both the heart of the City and vibrant South Bank, the building will enhance this historic location, which is most widely recognised as the origin of the Great Fire of London.

Alex Jordan, Leasing Director, said: “The Monument Building will showcase Skanska’s development capabilities in one of the world’s great cities.

“The building will demonstrate our ability to develop market-leading offices that meet the demanding needs of the modern occupier, while embracing sustainable construction and design.”

The Monument Building will complete in spring 2016.